To ensure the safe launch of beginner paddle users, the La Ferté Tourist Office recently installed two RotoDock sections measuring 1.50 x 3.00 m, positioned perpendicular to the existing dock. This configuration creates a sheltered area where the current is significantly reduced, making safe departures easier.

The installation was carried out quickly and efficiently, following these steps:

  1. Pre-assembly of the modules on the riverbank, approximately 1 km from the site
  2. Transport by water using a rigid inflatable boat
  3. Connection to the existing dock
  4. Anchoring with chains
  5. Installation of guardrail posts

All of these operations were completed in less than two hours, perfectly illustrating the simplicity and speed of installation of our equipment.